The Dispensary Build-Out Process From Lease to Opening
A step-by-step breakdown of what actually happens after a dispensary lease is signed, from permits and construction through inspections, corrections, and final approval to open.
Article Summary
- The build-out phase begins after lease execution and site control
- Construction, inspections, and corrections happen in defined stages
- Most delays occur during permitting and inspection revisions
- Opening approval is a process, not a single inspection
Overview
What “Build-Out” Means in Dispensary Construction
The dispensary build-out process is the phase where architectural plans
are turned into a compliant, inspectable retail space.
This phase begins once a lease is signed and ends only after final
approvals are granted to open.
Unlike traditional retail, dispensary build-outs are highly regulated,
inspection-driven, and often iterative.
Permitting
Permits, Plan Review, and Pre-Construction Approvals
After lease execution, plans are submitted for plan check and permitting.
This typically includes architectural drawings, security layouts,
electrical and mechanical plans, and accessibility considerations.
Permitting timelines vary widely and often introduce the first
major delays if revisions are required.
Construction
Physical Build-Out and Trade Coordination
Once permits are issued, physical construction begins.
This includes framing, electrical, plumbing, security infrastructure,
vault construction, and storefront work.
Cannabis projects require close coordination between trades to ensure
security and compliance requirements are built correctly the first time.
Inspections
Rough, Final, and Regulatory Inspections
Dispensary build-outs typically require multiple inspections.
These may include building, fire, electrical, and cannabis regulatory
inspections.
Inspectors verify that the constructed space matches approved plans
and that security, access control, and visibility requirements are met.
Corrections
Revisions, Fixes, and Re-Inspections
It is common for dispensaries to receive correction notices.
These require physical changes, documentation updates,
or clarification before approval is granted.
Each correction cycle can add days or weeks depending on scope
and inspector availability.
Approval
Final Sign-Off and Approval to Open
Opening approval is granted only after all inspections pass
and outstanding issues are resolved.
This may involve multiple agencies signing off independently.
Operators should expect a short gap between final inspection
and authorization to open.
Reality
Why Build-Out Timelines Are Often Longer Than Expected
Delays are most commonly caused by permitting backlogs,
inspection scheduling, revision cycles, and misaligned expectations.
Understanding the build-out as a process rather than a checklist
helps operators plan realistically and avoid costly surprises.
-
ProcessPhased and inspection-driven
-
TimingOften longer than initial estimates
-
RevisionsCorrections are common
-
OutcomeApproval to open, not just completion